Accelerate the energy transition by supporting 8 renewable projects in Spain and Italy.
The Solar&Storage Ambition project, led by the Green Enesys group, aims to finance the development of a portfolio of 8 renewable energy projects located in Spain and Italy.
This portfolio consists of 7 photovoltaic plants with a total capacity of 125 MW and a stand-alone battery storage project with a capacity of 65 MW.
This third funding tranche of €400,000 is currently open, as part of a maximum amount across all tranches of €4,800,000..
The funds raised will be used to finance the development costs of the projects, particularly the Spanish hybridization projects, for which we have obtained a technical audit report conducted by a specialized third party.
These four projects involve hybrid photovoltaic and battery energy storage (BESS) installations with a total capacity of 65 MW, located around Madrid (Spain).
The completion of this audit report was a prerequisite for the launch of this third tranche. The report covers the following elements:
- Site evaluation
- Preliminary environmental assessment
- Review of the land lease agreement
- Review of the grid connection solution
- Project design review
- Development process review
You will find more information on this topic in the ‘Project’ section, which we invite you to consult.
The offer
Financing a portfolio of solar and energy storage across Spain and Italy
Investment Opportunity
The Green Enesys Group offers an investment opportunity to finance a portfolio of 8 renewable energy projects located in Spain and Italy.
This portfolio, managed by the Spanish company Solar Ambition CF2 S.A., includes:
- 7 ground-mounted photovoltaic plants totaling 125 MW, including 4 hybrid projects with storage
- 1 stand-alone battery storage project (BESS) with a capacity of 65 MW.
Terms of the Offer and Refinancing
The objective of this fundraising is to set up a straightforward bond financing, structured in several tranches, with a total amount of €4.8 million and a maturity of 3 years.
The funds raised will be used for:
- the acquisition of the projects from the developers
- the financing of development costs until reaching RTB (Ready-To-Build) status.
Green Enesys intends to retain the assets in the long term, with a potential refinancing through bank debt or equity. Project sale may also be considered once the RTB stage is achieved.
Guarantees
Enerfip benefits from a first-ranking pledge on the company Bosque Desarrollos Fotovoltaicos España SL, which owns the project entities (SPVs) in Spain and Italy.
In the event of a default, activating this pledge will allow recovery of the residual asset value to ensure partial or full repayment to investors.
Specifications
Investment phases
- Investment open to everyone
End of project financing
Resources
Simulator
Investment simulation
Solar & Storage Ambition T3 - Obligation 9%/year over 2.8 years
Simulation - Rate : 9% / year on 2.8 ans
Initial investment:
€1,000
Repayments and interest:
€1,252
In 3 transfers
| Date | Interest* | Capital | Amount |
| 26/12/2026 | €90 | €0 | €90 |
| 26/12/2027 | €90 | €0 | €90 |
| 26/10/2028 | €72 | €1,000 | €1,072 |
| Total | €252 | €1,000 | €1,252 |
*Gross interest before tax, including all fees (view taxation) The dates are indicative. The final dates will be available once the project is officially closed. The result presented is not a forecast of the future performance of your investments. It is only intended to illustrate the mechanics of your investment over the investment period. The evolution of the value of your investment may vary from what is shown, either increasing or decreasing. | |||
The project
The proposed project involves financing 8 renewable energy projects, distributed between Spain and Italy, within the company Solar Ambition CF2 S.A.. This portfolio includes:
- 7 ground-mounted photovoltaic plants, with 1 in hybridization (with storage), for a total capacity of 125.36 MWc;
- 1 stand-alone BESS battery project with a capacity of 65 MWh.
Portfolio in Spain:
| Project | Typology | Capacity MWc | Storage Capacity MWh | Grid Connection | RtB Estimation |
|---|---|---|---|---|---|
| La Paz | Hybridization | 22.32 | 70.21 | Secured | Q1 2028 |
| El Coto | Hybridization | 6.02 | 20.06 | Secured | Q1 2028 |
| La Playa | Hybridization | 6.02 | 20.06 | Secured | Q1 2028 |
| La Cueva | Hybridization | 6.02 | 20.06 | Secured | Q1 2028 |
Total portfolio: capacity 40.38 MWc and storage capacity: 130.39 MWh
Portfolio in Italy:
| Project | Typology | Capacity MWc | Storage Capacity MWh | RtB Estimation |
|---|---|---|---|---|
| Giotto | PV | 18.88 | / | Q1 2026 |
| Verdi | PV | 50.90 | / | Q1 2027 |
| Cherubini | PV | 15.20 | / | Q1 2027 |
| BESS Sessa VI | Stand Alone | 65 | 624 | Q4 2026 |
Total portfolio: capacity 84.98 MWc and storage capacity: 65 MWh
Due Diligence:
Grid Connection:
The four projects have secured access to the distribution network from the distribution system operator (DSO), and the preliminary administrative authorization (AAP) has been officially requested for all installations.
Regarding hybridization, the integration of energy storage elements does not constitute a technological modification. Therefore, the installation can be considered unchanged for the network connection permit update.
Thus, no authorization issues currently prevent the integration of battery energy storage systems (BESS) into the photovoltaic plants.
Land:
The projects are in line with their current stage of development, and the proposed timeline for reaching Ready to Build (RtB) status is in line with expectations.
Portfolio Summary
- Total projects: 8 (7 PV + 1 BESS)
- Total capacity: 125.36 MWc (PV) + 65 MWh (BESS)
- Location: Spain (Madrid), Italy (Basilicata, Campania)
- Technology: PV + BESS
- RTB estimate: 2026–2028
Project owners
Our analysis
Investing in this participatory financing project involves risks, including the risk of total or partial loss of the capital invested. Your investment is not covered by the deposit guarantee schemes established in accordance with directive 2014/49/EU of the European Parliament and of the Council. Your investment is also not covered by the investor compensation schemes established in accordance with Directive 97/9/EC of the European Parliament and of the Council. Return on investment is not guaranteed. This is not a savings product, and we recommend that you not to invest more than 10% of your net assets in participatory finance projects. You may not be able to sell the investment instruments when you wish. If you are able to sell them, however, you may incur losses.